自1942年以來
Italiano Italiano Français Português Español Pусский

When a batch of concrete is being made with an SLM, the sequence for loading components may vary according to the MIX DESIGN and the type of additive. In general, theoretically, the correct sequence would be: Water (partial), Cement, Additive, Gravel, Sand + finishing Water (adjusted according to any moisture present in the aggregates at the time of loading).