自1942年以來
Italiano Italiano Français Português Español Pусский

The SLM productivity is influenced by the model size and several other factors: the kind of concrete to be batched and its slump, the distance of the pouring site from where the materials are stocked, the loading method employed, the hours of usage of the machine and the speed at which workers can spread the poured concrete